BIG unveils stepped timber hotel and housing scheme for Thun's Siegenthalergut district

ConstruBIM Editorial November 20, 2026 2 min read 2 sources checked

Bjarke Ingels Group and landscape architects August + Margrith Künzel propose four timber buildings, two hotels among them, as the gateway to a new district in Thun, Switzerland. Construction is expected to start in 2028.

Panorama of Thun, Switzerland
Image: WillYs Fotowerkstatt, CC BY-SA 3.0

Bjarke Ingels Group (BIG) has unveiled a stepped timber scheme for the entrance to the new Siegenthalergut district in Thun, Switzerland. Dezeen and Designboom reported the project on 20 November 2026.

The scheme

Titled Nachwachsende Stadt, or Growing City, the 13,000-square-metre development was designed with landscape architects August + Margrith Künzel. It comprises four timber buildings holding two hotels, residences and commercial space. According to Designboom, the proposal was selected through a competition organised by the developer Frutiger AG and the city of Thun, and it occupies one of the first two plots planned for the neighbourhood, opposite a sports centre and the future headquarters of the Swiss Football Association.

The most prominent building is a timber block with a cantilevered corner volume that houses a three-star and a four-star hotel under one roof. Its stepped form creates terraces that are mirrored by the upside-down cantilever, leaving a central rift that is glazed to bring light inside. Shared amenity spaces cut diagonally through the structure, and a rooftop restaurant and commercial spaces along the street are planned. Three residential buildings, also timber, use a more regular grid with projecting bays and set-back terraces around a shared courtyard.

Sustainability and timeline

BIG used timber to lower the carbon footprint and designed the buildings for future disassembly and reuse. Green roofs, photovoltaic panels and rainwater retention are intended to reach the SNBS Gold standard, Switzerland's sustainable building benchmark. Dezeen reports that construction is expected to start in 2028. Partner Sören Grünert described the site as a chance for Thun to grow without losing its character, with the district becoming a gateway and a landmark.

Why it matters

The project shows how mid-rise mass timber is being used for mixed hospitality and housing programmes where the structure itself shapes the architecture. Designing for disassembly puts the reuse promise into the geometry, and a start on site in 2028 leaves time for the competition scheme to move through permitting and detailed design. Readers should treat the images as visualisations of a design proposal, not a built project.

Image: Panorama of Thun, Switzerland. Photo: WillYs Fotowerkstatt, CC BY-SA 3.0, via Wikimedia Commons.

Sources checked for this story

  1. Upside-down cantilever cracks open timber hotel by BIG — Dezeen, November 20, 2026
  2. BIG stacks timber volumes with alpine views for new neighborhood in Switzerland — Designboom, November 20, 2026
timberhotelBIGSwitzerlandarchitecture
More stories
All news →

Need this done, not just read about?

Describe your scope and our quote engine returns cost, team size and timeline live.

Get an instant quote