Foster + Partners and Manica unveil the 71,500-seat Generali Stadium to replace San Siro

ConstruBIM Editorial October 30, 2026 2 min read 2 sources checked

Foster + Partners and Manica have revealed the design of a 71,500-seat stadium for AC Milan and Inter on the San Siro site, with construction expected from 2028 once plans are approved.

The existing Giuseppe Meazza (San Siro) stadium in Milan
Image: johnseb, CC BY 2.0, via Wikimedia Commons

Foster + Partners and the US studio Manica have unveiled their design for the Generali Stadium, a 71,500-seat football stadium for AC Milan and Inter Milan that will replace the San Siro. Dezeen reported the reveal on 29 October 2026 and the Architects' Journal followed on 30 October 2026.

The design

Foster says the seating bowl takes its cues from the existing stadium's distinctive curvas, but brings the stands closer to the pitch. The roof frames and emphasises the two curvas, and the architects say it will integrate photovoltaic technology and acoustic measures. Foster calls it "a holistic and monumental piece of infrastructure rising approximately 60 metres in height". Insurer Generali holds the naming rights.

Who is behind it

AC Milan and Inter appointed Foster + Partners and Manica after Milan City Council agreed to sell the existing stadium and the surrounding land to the clubs. The wider regeneration covers about 281,000 square metres. Manica is a sports venue specialist founded by David Manica.

Timeline

The Architects' Journal reports that construction is expected to start on site in 2028, once the plans are approved, and that the clubs hope to play their first matches in the 2031/32 season. Dezeen reports that completion is targeted for the 2032 European Championship, after which the San Siro will be demolished. The 2021 Populous scheme was dropped after delays, and Dezeen links the delays partly to the threat of a heritage listing for the San Siro.

Why it matters for delivery teams

A stadium of this scale sits inside a large urban masterplan. The structure, the roof and the surrounding blocks will have to be coordinated across designers, clubs and the city. The milestones to watch are the planning approvals and the 2028 start on site.

Image: The existing Giuseppe Meazza (San Siro) stadium, Milan. Photo: johnseb, CC BY 2.0, via Wikimedia Commons.

Sources checked for this story

  1. Foster + Partners reveals plans for San Siro stadium replacement in Milan — The Architects' Journal, October 30, 2026
  2. Foster + Partners unveils replacement for landmark San Siro stadium in Milan — Dezeen, October 29, 2026
StadiumFoster + PartnersMilanFootballArchitecture
More stories
All news →

Need this done, not just read about?

Describe your scope and our quote engine returns cost, team size and timeline live.

Get an instant quote