BIM scopes & bid inquiries
Search what the market is asking for. Match it to a scope.
Type a keyword from an RFP, a tender notice or a client email. We match it against our library of standard BIM scopes of work, point you to the public portals where that kind of bid is published, and take your inquiry for a priced response in one business day.
Try: · · · · ·
Scope library
Standard BIM scopes of work, written the way tenders ask for them.
Each package lists what is delivered, what we need from you to start, and the ISO 19650 documents it maps to. Use one as the basis of your inquiry, or as a checklist against an RFP you received.
Market inquiries
Where BIM bids and RFPs are published.
Public procurement portals that regularly carry BIM, digital-delivery and information-management scopes. Open the portal and paste the search string. If you find a notice you want to bid, send it to us through the inquiry form below and we return a scope and price.
These are third-party public portals; ConstruBIM is not affiliated with them. Registration is usually free. Search terms in other languages: modelado de información de construcción, maquette numérique, نمذجة معلومات البناء.
Send an inquiry
Have an RFP, a tender or a scope in hand? Send it. We bid it.
Paste the scope text or the notice link. Within one business day you receive a written scope, a team and a price from the global rate card, plus the questions we would raise before committing.
- Any discipline: architecture, structure, MEP, facade, civil and infrastructure.
- Any format: Revit, Archicad, Tekla, Civil 3D, IFC, Navisworks, point clouds.
- ISO 19650-aligned documents (BEP, MIDP, TIDP) included when the tender asks for them.
Before you bid
Three things to confirm in any BIM scope.
1. Information requirements
- Is there an EIR (exchange information requirements) or equivalent?
- Which LOD / LOIN per element and stage?
- Classification system (Uniclass, OmniClass, MasterFormat)?
2. Environment and formats
- Which CDE (ACC, BIM 360, Trimble Connect, Aconex)?
- Native authoring format and version, plus IFC schema.
- Shared coordinates, units, naming convention (ISO 19650-2 Annex).
3. Deliverables and cadence
- Milestones and model-exchange dates (MIDP).
- Coordination frequency and clash tolerance rules.
- Handover: COBie, asset data, as-built verification method.